
Completed Projects
South-to-North Water Diversion Project
Spool Installation and Mooring Analysis for A Project in West Africa
Pile Associated Analysis for A Project in West Africa
Project Cooperation for Pipeline Span Tool Development and Study
A FPSO Mooring Analysis and Structural Strength Analysis for MMS & YOKE
Launch Barge Capacity Verification for WenChang Jacket Launch
Installation Design for Three(3) Pipelines in a Zhejiang Pipe Laying Project
Pile Driving Dynamic Monitoring for DongFang Two Jackets
CaoFeiDian Shallow Water Jackets(2) Basic Design
Heavy Marine Transport Design for a Jack-up Transportation from Turkey
Platform Installation Design for the platform in Indonesia Madura Sea
DongFang Three Jackets Detail Design
Jacket Installation Design for some Jackets in Gulf of Moattama
LiWan Module Lifting Motion and Environmental Monitoring
Shallow Water Floatover Installation Design for JZ Topside
3068t (@80.7m water depth)Jacket Design for a jacket in East China Sea
HMT engineering and Sea-fastening design for a Self-evaluated Platform
A FPSO’s Three Modules Engineering Verification for Lifting and Transportation
Piles Transportation Engineering for a project
4976t (@79.6m water depth)Jacket Design for a jacket in East China Sea
Topside Decommission Study With Two-Barges-Floatover Method
Heavy Marine Transport Engineering Verification
KL Jacket Pile Driving Dynaminc Monitoring
A FPSO‘s Station Keeping Analysis
A FPSO's Modules Lifting Installation Engineering
Strain Gauge Installation and LMU Stress Monitoring
14,700t Topsides Floatover Installation Design
BZ Topside Platform Floating Movement and Environmental Monitoring
LMU & DSU Structural Check for confidential project
Structural Design of the Stinger for two Pipeline Laybarges
82m, 3379t Jacket Installation Design
1099t / 644t (@55.4m water depth)Jacket and Topside Installation Design
PL Jacket Pile Driving Dynaminc Monitoring
WC Topside Floatover monitoring
81m, 9543t Jacket Basic Design 3rd Party Verification
964t/1748t/1150t (@40.63m water depth)Jacket and Topside Installation Design
KQ Topside Lifting Floating Movement and Environmental Monitoring
WC Jacket Pile Driving Dynamic Monitoring
116m, 7200t Jacket Detail Design
92m, 3000t Jacket Detail Design
103m, 3240t Jacket Detail Design
63m, 2474t Jacket Basic Design
190m, 23,000t Jacket Installation Design
11,800t Topsides Floatover Installation Design
13000t(@77m water depth)Topsides Floatover Mooring and Mating Analyses
11,500t Topsides Floatover Installation Design
22,500t Semi-submersible Drilling Platform Dry Tow Structural Analysis
79m, 2685t Jacket Detail Design
80m, 3428t Jacket Detail Design
Project Cooperation for Pipeline Span New Treatment Study
Five (5) Pipelines Installation and Anchor Patterns Mooring Analysis
Floating and Submarine Hoses Engineering Consulting Services
LMU Structural Check for Two(2) Bohai Bay Floatover Topside