Completed Projects
- South-to-North Water Diversion Project
- Spool Installation and Mooring Analysis for A Project in West Africa
- Pile Associated Analysis for A Project in West Africa
- Project Cooperation for Pipeline Span Tool Development and Study
- A FPSO Mooring Analysis and Structural Strength Analysis for MMS & YOKE
- Launch Barge Capacity Verification for WenChang Jacket Launch
- Installation Design for Three(3) Pipelines in a Zhejiang Pipe Laying Project
- Pile Driving Dynamic Monitoring for DongFang Two Jackets
- CaoFeiDian Shallow Water Jackets(2) Basic Design
- Heavy Marine Transport Design for a Jack-up Transportation from Turkey
- Platform Installation Design for the platform in Indonesia Madura Sea
- DongFang Three Jackets Detail Design
- Jacket Installation Design for some Jackets in Gulf of Moattama
- LiWan Module Lifting Motion and Environmental Monitoring
- Shallow Water Floatover Installation Design for JZ Topside
- 3068t (@80.7m water depth)Jacket Design for a jacket in East China Sea
- HMT engineering and Sea-fastening design for a Self-evaluated Platform
- A FPSO’s Three Modules Engineering Verification for Lifting and Transportation
- Piles Transportation Engineering for a project
- 4976t (@79.6m water depth)Jacket Design for a jacket in East China Sea
- Topside Decommission Study With Two-Barges-Floatover Method
- Heavy Marine Transport Engineering Verification
- KL Jacket Pile Driving Dynaminc Monitoring
- A FPSO‘s Station Keeping Analysis
- A FPSO's Modules Lifting Installation Engineering
- Strain Gauge Installation and LMU Stress Monitoring
- 14,700t Topsides Floatover Installation Design
- BZ Topside Platform Floating Movement and Environmental Monitoring
- LMU & DSU Structural Check for confidential project
- Structural Design of the Stinger for two Pipeline Laybarges
- 82m, 3379t Jacket Installation Design
- 1099t / 644t (@55.4m water depth)Jacket and Topside Installation Design
- PL Jacket Pile Driving Dynaminc Monitoring
- WC Topside Floatover monitoring
- 81m, 9543t Jacket Basic Design 3rd Party Verification
- 964t/1748t/1150t (@40.63m water depth)Jacket and Topside Installation Design
- KQ Topside Lifting Floating Movement and Environmental Monitoring
- WC Jacket Pile Driving Dynamic Monitoring
- 116m, 7200t Jacket Detail Design
- 92m, 3000t Jacket Detail Design
- 103m, 3240t Jacket Detail Design
- 63m, 2474t Jacket Basic Design
- 190m, 23,000t Jacket Installation Design
- 11,800t Topsides Floatover Installation Design
- 13000t(@77m water depth)Topsides Floatover Mooring and Mating Analyses
- 11,500t Topsides Floatover Installation Design
- 22,500t Semi-submersible Drilling Platform Dry Tow Structural Analysis
- 79m, 2685t Jacket Detail Design
- 80m, 3428t Jacket Detail Design
- Project Cooperation for Pipeline Span New Treatment Study
- Five (5) Pipelines Installation and Anchor Patterns Mooring Analysis
- Floating and Submarine Hoses Engineering Consulting Services
- LMU Structural Check for Two(2) Bohai Bay Floatover Topside