Completed Projects
- Platform Installation Design for the platform in Indonesia Madura Sea
- Jacket Installation Design for some Jackets in Gulf of Moattama
- 3068t (@80.7m water depth)Jacket Design for a jacket in East China Sea
- 4976t (@79.6m water depth)Jacket Design for a jacket in East China Sea
- KL Jacket Pile Driving Dynaminc Monitoring
- BZ Topside Platform Floating Movement and Environmental Monitoring
- 1099t / 644t (@55.4m water depth)Jacket and Topside Installation Design
- 964t/1748t/1150t (@40.63m water depth)Jacket and Topside Installation Design